1600 meters of bridge structure have now been placed on the approximately four-kilometer-long Storstrøm Bridge.
- The Storstrøm Bridge construction is progressing despite challenges for the contractor. Bridge girders number 17-18S were lifted in week 40 near the coast of Falster. With these girders, the two southern sections of the bridge were connected, creating a continuous 880 meters of bridge that is now connected to Falster, says the Danish Road Directorate, the project's builder.